Steel Erection Engineering
Erection planning, sequencing, temporary stability, lifting, bolting, field welding, alignment, tolerances and safety.
A structure is often most vulnerable while it is being built. Erection engineering plans the sequence, temporary bracing and lifting so that every stage is stable, and defines how alignment and tolerances are achieved and checked.
This is general guidance. It does not replace the project-approved erection method statement or the responsibility of the competent engineer for temporary works.
Topics in this category
Planning
- Erection Planning
- Erection Sequencing
- Temporary Stability
- Temporary Bracing
Execution
- Crane Lifting
- Lifting Points
- Bolted Assembly
- Field Welding
- Alignment
- Erection Tolerances
- Site Inspection
- Construction Safety
Articles
Articles in this category are being authored and go through editorial and technical review before publication.
Planning a steel structure project?
Share your drawings, location and design standard. Our engineering team will review the scope and respond with the next steps.